| |
|
|
|
Location: North Central Alabama along the banks of the Tennessee River, 75 miles north of Birmingham, 116 miles south of Nashville, 25 miles west of Huntsville and 200 miles southeast of Memphis. The port facility is located on mile 299.0L of the Wheeler Reservoir. The industrial park is part of General Purpose Zone #83.
Area & Topography: Fully-served 1,000 acre site Land cost per acre: $25,500 & up (includes all utilities) Gently rolling slopes of 2 to 6% The land ranges from 556 to 600 ft. above sea level.
Transportation: Highway: US 72-A - Four Lane, on site (E/W); US 31 - Four Lane, 8 miles from site (N/S); Interstate 65 - 15 miles from site (N/S) Railroad: Norfolk Southern Water: Public port facilities, direct access to the Tennessee River Air: Commercial Service: Huntsville/Madison County International Airport (20 miles) General Aviation: Pryor Field (10 miles)
Infrastructure: Electric: Joe Wheeler Electrical Co-op, TVA Water: Decatur Utilities - 20-inch main on site Gas: Decatur Utilities - 10-inch main on site Wastewater: Decatur Utilities - 24-inch main on site
Current Companies: United Launch Alliance (joint venture between The Boeing Company and Lockheed Martin) Worthington Steel Nucor Steel Feralloy Corporation Monarch Steel Steel Technologies Neo Industries Hexcel Independence Tube Corporation Friedman Industries OCI Chemicals
Available Property: Approximately 400 available acres Mi-Tech (42 acres) Glenn Site (269 acres) River Site (100 acres - 70 usable)
|
| |
|
|
|
|